الأعضاء: برجاء تسجيل الدخول
ذهاب إلى تجاري Choose Language:

Complete Track Renewal (Secondary) of the existing 90 rails over CST-9 sleepers (in stretches) with Sh 52kg rail over 52 Kg Psc Sleeper with fittings with deep screening and raising of ballast cushion to the standard 15 Cm of classification yard at BMY yard for 15 KMS between BSP-DUG, 2] Painting of Doors, Windows and Grills of staff Quarters, Repairs to Ceiling Plaster by Guinting in staff Quarters, Repair to Office and store, Repairs to Roof Leakage of RCC Flat Roof slab in Staff Quarters at WRS Colony, RVH colony, Engineering Colony and Loco colony, Augmentation of Water Supply by Providing one More PVC Water Storage Tank of 1000 litres capacity each in quarters of Block in WRS colony.

طلب تقديم عروض

معلومات عامة

البلد:   الهند
المدينة/المنطقة:   Raipur
تاريخ النشر:   سبتمبر 11, 2008
الموعد النهائي:   أكتوبر 16, 2008
المشتري:   South East Central Railway
اللغة الأصلية:   عربي

البضائع والأشغال والخدمات

 
يرجى ملاحظة أن هذا الإِشعار لمعلوماتك فقط.
نحن نبذل قصارى جهدنا لتوفير أحدث المعلومات وأكثرها دقة على موقع الويب الخاص بنا، ولكننا لا نستطيع ضمان خلو كل المعلومات المتوفرة من الأخطاء.
إذا كانت لديك أية اقتراحات خاصة بتحديثات/تصحيحات لهذا الإشعار، تفضل بإخبارنا.
English عربي
عن تجاري | سياسة الخصوصية | تعليمات الشراء | البنود والشروط | RSS |